1980
Satsop WA. Lampson International working on Nuke Site with TransiLift , Im on the right
|

Another
1980 Satsop photo: Ironworkers L-R Ed: Watkins, Jim Weaver, Steve Tilton, Rod Sutton, yours truly, Pat Walsh.
|
|

1987 Seattle,
WA. Washington Mutual Tower, Herrick Corporation Steel Erector. I'm in a "skip box" hanging from the tower crane
at lunch taking the picture looking west.The guy having lunch sitting on the beam was our derrick "phone man", Stan
Wilkes.
|

2007 Topping Out: REC Silicon Expansion Project Moses Lake, WA. General
Contractor Fluor Corporation, Union Steel Erector,
The Erection Company
|
|

When I retired in 2000 my first major purchase was for me (on left) to negotiate
a deal on my new motor home!
|

Late
90's Ballard High School L-R Doug Pratt, unknown, Buck Ganske, Ray Helgath, Mickey McGuire, Pat Hagan and Eric Price
|
|

Beside being
a Journeyman Ironworker and friend, Art Ristow III and myself were connecting partners for over 20 years ;-))
|

Now here
is a job shack! I took the picture at coffee break, L-R Mike Miller, John Hatzenbihler and Earl Parker. Where
is the apprentice to mop this place up?
|
|

1978 Outside
Kuosheng, Taiwan. Taiwan Power Company Unit 1 Setting of 1100 Ton Reactor Pressure Vessel. I'm phoning the two winch operators.
Boom length 325 feet. 2000 ton capacity.
|

1979 Shearon Harris Nuclear Plant, New Hill, North Carolina for Carolina Power and
Light. 410 Ton test load before actual setting of reactor pressure vessel. 325 foot stiff leg derrick, Rigging International
|